15 Hawk Green Construction
The
re development of the entire Hawk GC 15th green complex includes the re –
design of the putting green, green surrounds, fairway and bunkers. This project has been identified as
the number 1 priority in the master plan and has been discussed at the
committee and board level for more than a decade.
The
new green in this proposal will be almost 60% larger in size than the original green
and the new design will provide:
·
Improved
playability
·
Greater
variety of hole locations
·
Larger
target from the tee
·
Enhanced
recovery shot options
·
Improved
strategic shot values
·
More
user friendly for higher handicap players
·
Improved
agronomics
o
enhanced
drainage
o
improved
wear tolerance from foot traffic
o
reduced
winter injury potential
The scope of work during this re
design will include demolition of all existing features and turf on the green
side of the pond, limited tree removal, complete new drainage and irrigation
installation and all new sod on the putting green, fairway and rough.
The construction schedule for this
project is September 23rd - October 17th. The project will require
closing the golf hole until the end of the season.
The opening schedule for the new green
in the spring of 2014 will largely be dependent on weather and soil
temperatures which affect turf growth and rooting of sod. A normal spring and
the green may be open by early May and a cool spring may see the green open a
few weeks later.
Priddis Greens Management will provide
project management while working closely with Wade Horrocks from ground3 (GC
Architect) & Goodwin Golf (Builder) to complete the project.
Comments