10 Hawk Tee Update


The 10 Hawk Tee construction / re alignment project was completed this past week with the exception of asphalting the cart path and pouring the concrete curbing. Asphalt is scheduled for Tuesday August 16th and curbing on Thursday August 18th.

Opening date for using the new tees will depend on how quickly the turf begins to firm up and take root. In order to re open the tee sooner than later, a range mat may be used to reduce damage to the newly installed turf.

The following Photos highlight the work that was performed.


Stripping bentgrass off the old silver tee. The sod was saved for re installation on the new tee.

Shaping the new tee after all the turf was stripped and the sand base was salvaged for re -use.
The installation of new irrigation piping and relocation of sprinklers.

The sand base being prepared and leveled on the new tee location.


The bentgrass sod that was salvaged being reinstalled on the new tee
Sodding the tee tops almost complete

The new tee complete. Asphalting and curbing will be complete this coming week and the tee will open for play soon after.